Extra Heavy Fuel to Power Plant
GO  &  $ recovery
thermal power plant
optimum fueling

Fuel oil heating value

When generating thermal electricity, only recovered kilocalories or BTU are important: the additional qualities of the fuel oil are not improving the produced KWH quality. In other words, burning LPG , gas oil , domestic fuel or any oil product that could be better used, means burning its better properties� and wasting the differential part between thermal content value and total real cost .

Imported fuel

If fuel was available at power plant fence door, it may be assumed every plant manager would decide buying the cheapest heaviest fuel offered.

Unfortunately usually fuel is imported from overseas and sea tanker tranported .

Here start transport limitations, whatever their name:

Each fuel has its own specific properties, but as first estimation:

  1. Light fuel, such FO 180, is usually easy to transport
  2. Heavy fuel, such FO 380, is usually difficult and may be impossible to transport
  3. Extra heavy fuel , such pitch, is not intended to be transported

Burned fuel

Thermal power plant usually burns fuel in a steam boiler to generate high pressure steam for the alternator steam turbine. Any fuel can be supplied to the boiler burners, provided the required viscosity is respected.

Typical example . Economical Feasibility

An excellent image of distillates and fuel prices correction with properties and specially viscosity is the spot price in various harbours where they are exported. Mid april 2008, Singapore, for instance, an average range is:

For the example , following is assumed:
Depending on imported heavy fuel characteristics, transport of FO180 is possible
but transport of FO380 not possible.
Power plant FO consumption: 400 000 T/Y
 
As shown on the simplified flow scheme hereafter, it is possible to import a fuel at 546 US $/T
and burn a transformed fuel costing only 520 US $/T:

Positif result # 400 000 T/Y * 26 $/T = 10.4 MM $/Y

A simple skid mounted distillation unit is necessary to achieve the gas-oil separation from the imported fuel.( mini-refinery type fractionation unit).

Pay-out time less than 1 year (our unit delivery time about 1 year)

 

Supply preliminary information about your power generation case to start preliminary feasibility study:

Mail

informations here

 

Power plant size

Large (50 to 500 MW for instance):

Medium (3 to 30 MW for instance):

Diesel engine generator drive:

 

 

free web tracker